CONSTRUCTION OF DRAINAGE – TITAN, TINERETULUI AND CAROL

Construction of drainage from the right side of the box and other works to the sewerage system of lakes Titan, Tineretului and Carol –
The client: BUCHAREST CITY HALL, General Contractor: SC ROTARY CONSTRUCTII SRL

 

Scope of work – lowering the groundwater on the right side of the river Dambovita apron collector to A0.

Location – will perform in Bucharest on the right side of Dambovita River at the entrance to the village, the bridge Ciurel, to exit Lake Vitan.

Share pipe fitting – a drain will be installed at a depth of 6 to 8 m so that they can meet the requirement specification.

Pipe – HDPE or PP type diameters DN160 – 355mm which will be installed by horizontal directional drilling technology. She will have slot of 0.3-0.5 mm

The work is divided into several sections, each section will have a pumping station in Dambovita flush that will be linked through the WWTP SCADA Glina.

Also be installed HDPE pipe DN 160mm – 250mm who will act as transport of secondary drains water.

drain
pipe HDPE / PP DN 160mm – 355mm
perforations 0.3-0.5mm
Quantity installed 9361ml

Secondary drain collector
HDPE pipe DN 160mm – 250mm
Quantity installed 5437ml