REHABILITATION AND EXTENSION OF WATER SUPPLY AND SEWERAGE IN BUFTEA CITY

b1
b2
b3
Object of the contract consists in the enlargement and rehabilitation works of water supply networks and sewerage in the city Buftea, as follows:

EXTENSION AND REHABILITATION OF WATER SUPPLY SYSTEM
Rehabilitation of water supply HDPE pipes, Total Length = 19 566 m;
Extension of water supply HDPE pipes, Total Length = 32 859 m;
Branching to the distribution = 4,000 users
Expand sewerage

Extension of sewerage network with vitrified clay pipes, Total Length = 45 444 m;
Manholes / intersection;
Connections to sewage system = 4,000 users;
Pumping through 13 wastewater pumping stations, fully equipped and automated;
The discharge pipe from the pumping stations with a total length of 4.503 m.
The project is co-financed from the Cohesion Fund through the POS Mediu (2007-2013) program.